Tags
Language
Tags
April 2024
Su Mo Tu We Th Fr Sa
31 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 1 2 3 4

Fundamentals of Shiftwork Scheduling: Fixing Stupid (Shiftwork, Fatigue and Safety) (Volume 2)

Posted By: AlexGolova
Fundamentals of Shiftwork Scheduling: Fixing Stupid (Shiftwork, Fatigue and Safety) (Volume 2)

Fundamentals of Shiftwork Scheduling: Fixing Stupid (Shiftwork, Fatigue and Safety) (Volume 2) by James C Miller Ph.D.
English | December 5, 2013 | ISBN: 1544694296 | 214 pages | AZW3 | 3.44 MB

This book covers shift lengths from four to 24 hours, and numbers of crews from one to five. Shift plan examples include 4-, 6-, 8- 12- and 24-hour shift lengths, split-crew plans, a plan for part-time workers, and eight-plus-twelve-hour shift length combination plans. The Continental, Metropolitan, Panama, DuPont, oilfield/offshore, maritime watchstanding (classic and "close") and other known shiftwork plans (rotas) are assessed critically. This is the most comprehensive, non-proprietary explanation of shiftwork scheduling available on the market. It should probably be in the library of every individual or team responsible for the scheduling of 24/7 operations. It may also be used as an inspection tool to help determine whether shiftwork-induced fatigue or shift work sleep disorder (SWSD) may have been a contributing factor in an accident. The book contains 155 scientific and technical references.